May 06, 2024
Skylight
- (3.0 hours)
Category: Empennage
Finished up some small jobs then started the Skylight assembly. Drilled the forward edge of the Acrylic with a #30 drill that was dulled to a conical shape on my bench grinder. Drilled the spacer strips #30 and trimmed the ends.